Dubai Forums archive (old posts) - to navigate to the current version click Dubai Forums
Dubai Expat Help Dubai Chat Dubai Romance Dubai Auto Dubai Jobs Dubai High Tech Dubai Guide Secretarial jobs in Dubai Accommodation in Dubai Jobs in Dubai Available Professionals in Dubai Learn Arabic Philosophy Forum

Dubai Expat Forum - Dubai Business Discussions - Business Ideas, Dubai Economic Laws

Rail Road Track Steel (HMS1)


barbarianIIu TERMS AND CONDITIONS AS FOLLOWS COMMODITY: Used Rail Track SIZE: 12.5 meters - To be cut to buyer’s needs SPECIFICATION: ISIR Codes R50-65 COMPOSITION: Non-metal impurities total 1% (one percent) or Less No Radiation Mn: 0.60-1.05 C: 0.54-0.82 Si: 0.18-0.12 S: 0.04 Max; AS: 0.01% Max of Mass Share Cr: Residual. TOTAL QUANTITY: 90,000 MTS (+/- 5%) FIRST SHIPMENT: 30,000MTS PRICE: $390 (USD Three hundred ninety dollars)/ MT (Metric Ton) FAS Mobile Port – Alabama – USA TERMS OF PAYMENT: Letter of Credit Confirmed, Irrevocable and by wire transfer to Seller bank account once we provide shipping document showing the arrival of the vessel at port of Mobile – Alabama. Within One (1) day after portage GUARANTEE OF FUNDS: By Letter of Credit/before departure of goods LOADING TERMINAL: N/A DELIVERY PORT: Port of Mobile, AL. USA. DELIVERY SCHEDULE: 30-45 days after Signing Sales/Purchase Agreement PACKAGING: Break Bulk Shipment INSPECTION: To be conducted at the loading port by SGS or its equivalent This offer will become automatically invalid by 5PM (EST) New York time, on Monday March 17, 2008. Who should the FCO be made out to? +Benoit B. III Skype:Barbarian2u



Dubai Forum | Paris Forum | Vegan Forum | Brisbane Forum | 3D Forum | Classified Jobs in Dubai | Listings of Jobs in London | London classified ads Portal
| © 2021 Dubai Forums | Privacy policy